Fiberglass parts installed, 09/10/00 |
Fiberglass parts installed, 09/10/00 |
Fiberglass parts installed, 09/10/00 |
Brakes and wheel assy, 09/22/00 |
Brakes and wheel assy, 09/22/00 |
Brakes and wheel assy, 09/22/00 |
Brakes and wheel assy, 09/22/00 |
Started fitting empennage fairings, 11/04/00 |
Finished empennage fairings, 11/10/00 |
Working on the wheel and leg fairings, 12/06/00 |
Wheel and leg farings completed, 12/08/00 |
Fitting the top cowl and cowl cheeks, 12/17/00 |
Fitting the top cowl and cowl cheeks, 12/17/00 |
Fitting the bottom cowl, 12/23/00 |
Fitting the bottom cowl, 12/23/00 |
Cowl installed, 12/28/00 |
Cowl all filled and primed, 02/05/01 |
Working on intersection fairings, 02/08/01 |
Working on intersection fairings, 02/09/01 |
Intersection fairings completed, 02/19/01 |
Extra glass work in empennage fairing, 02/20/01 |
Almost ready to go the airport and install the wings, 03/25/01 |
Sensenich 72 inch 85 pitch prop installed, 04/21/01 |
Sensenich 72 inch 85 pitch prop installed, 04/21/01 |
Sensenich 72 inch 85 pitch prop installed, 04/21/01 |
Loaded and headed to the airport, 05/18/01 |
Thanks to Ace Towing for a great job, 05/18/0 |
Loaded and headed to the airport, 05/18/01 |
At the airport, 05/18/01 |
Wings installed, 05/25/01 |
Wings installed, 05/25/01 |
First engine start, 06/22/01 |
Started taxi testing, 06/23/01 |
Ready for first flight, 07/15/01 |
Taxing back after the first flight, 07/15/01 |
All goes well, the RV grin, 07/15/01 |