RV4 Miscellaneous Assemblies


Fiberglass parts installed, 09/10/00

Fiberglass parts installed, 09/10/00

Fiberglass parts installed, 09/10/00

Brakes and wheel assy, 09/22/00

Brakes and wheel assy, 09/22/00

Brakes and wheel assy, 09/22/00

Brakes and wheel assy, 09/22/00

Started fitting empennage fairings, 11/04/00

Finished empennage fairings, 11/10/00

Working on the wheel and leg fairings, 12/06/00

Wheel and leg farings completed, 12/08/00

Fitting the top cowl and cowl cheeks, 12/17/00

Fitting the top cowl and cowl cheeks, 12/17/00

Fitting the bottom cowl, 12/23/00

Fitting the bottom cowl, 12/23/00

Cowl installed, 12/28/00

Cowl all filled and primed, 02/05/01

Working on intersection fairings, 02/08/01

Working on intersection fairings, 02/09/01

Intersection fairings completed, 02/19/01

Extra glass work in empennage fairing, 02/20/01

Almost ready to go the airport and install the wings, 03/25/01

Sensenich 72 inch 85 pitch prop installed, 04/21/01

Sensenich 72 inch 85 pitch prop installed, 04/21/01

Sensenich 72 inch 85 pitch prop installed, 04/21/01

Loaded and headed to the airport, 05/18/01

Thanks to Ace Towing for a great job, 05/18/0

Loaded and headed to the airport, 05/18/01

At the airport, 05/18/01

Wings installed, 05/25/01

Wings installed, 05/25/01

First engine start, 06/22/01

Started taxi testing, 06/23/01

Ready for first flight, 07/15/01

Taxing back after the first flight, 07/15/01

All goes well, the RV grin, 07/15/01