RV4 Firewall Forward


AEIO-360-H1A Engine, 09/16/00

Used AEIO-360-H1A Engine selected, 09/16/00

Motor mount and gear legs installed, 09/21/00

Finally the airframe is supporting its own weight, 09/23/00

Brake master cylinder installed, 09/21/00

Starter relay installed, 10/20/00

Heater box installed, 10/20/00

Inverted oil system valve installed, 10/21/00

Engine mounted, 10/22/00

Oil separator mounted and hoses connected, 11/15/00

Throttle cable mount fabricated and installed, 11/20/00

Mixture cable mount fabricated and installed, 11/21/00

Vetterman 4 pipe exhaust installed, 11/24/00

Vetterman 4 pipe exhaust installed, 11/24/00

Vetterman 4 pipe exhaust installed, 11/24/00

Installed the oil and fuel pressure senders, 12/09/00

Front baffling with oil coller mount built, 01/10/01

Front baffling with oil coller mount built, 01/10/01

Working on baffling, 01/12/01

Baffling completed, 01/28/01

Baffling completed, 01/28/01

Building the air box, 02/15/01

Air box completed, 02/16/01

Air vent installed, 04/06/01

Air vent installed, 04/06/01

Heater vent installed, 04/01/01

Heater vent installed, 04/01/01

Engine installation completed, 06/10/01